Water Bath Formation System
|
WATER BATH FORMATION TANK Each tank has a front side of 1.2 m, which can be automatically opened and closed at each charging cycle. Battery move inside the tank is assured by a motorized belt, covering the whole tank surface. AUTOMATIC BATTERY LOADING SYSTEM |
|
|
Once the row is completed, the system transfers it to the tank loading conveyor, consisting of a motorized belt that transfers the batteries up to the loading position of the tank. The conveyor is provided with supporting frame and guide, on which the loading shuttle (see picture above) can slide up to proper position in front of each tank. AUTOMATIC BATTERY UNLOADING SYSTEM The conveyor is provided with supporting frame and guide, on which the shuttle can slide up to proper position in front of the tank. The exit conveyor, positioned at the end of the unloading belt, equipped with a pusher, transfers the batteries one by one to the finishing line. |
|
|
WATER COOLING & AIR FILTERING SYSTEM The upper part of the filter comprises a structure which acts as a drop separator; an electric centrifugal suction fan is built-in the tower, with a polypropylene impeller, directly coupled with the electric motor. The central part houses the filling units, comprising the balls that treat the polluted material by back-flow water circulation. The wet filter is supplied complete with the electric control panel. The connection between wet filter and formation tank is at customer's charge. |
|
|
A neutralization system of the acid contained in the re-circulation water is provided to keep the ph level within the set range. The system includes the ph detector, as well as the sulphate detector; soda milk is fed automatically, according to the ph level detected in the water tank. |
|






